Friday, 19 November 2010

Charnwood Cove 1 with log stand stove illogan Cornwall

This installation was carried out over 2 days allowing the customer to do the building work himself.
The liner was pulled up the chimney on this occasion because there was a long 45 degree run in the chimney that made feeding in from the top awkward.
Also the customer wanted to keep the flue pipe stainless, we polished the flue at the end of the installation.


The materials for the job, liner, stainless pipe, cowl, rockwool, lightweight insulating back fill.



The customer has done all the building work, once the fire plate has been installed the opening and hearth will be finished.





The liner in place ready to be installed.



The fire plate was an unusual shape so we made a cardboard template before cutting it out of steel.



The finished fire plate with the adaptor hole.



The fire plate has been installed and painted black, in the centre you can just make out the flue adaptor that the stove pipe will attach to.






looking down on the pot shows the new liner and back fill.



We returned a week later when the opening and hearth had been finished and painted.



The completed stove installation.



A close up shows the log stand with kiln dried wood and stainless stove pipe.



The stove is lite, this first burn removes any manufacturing oils and grease.
We supple a bag of kiln dried wood with every stove installation, this allows the customer to see how well
the stove burns with good quality wood.



Charnwood Cove 1 with log store, wood and multi fuel burning stove.

For more information about us and our services please visit our showroom at

Unit 3M, Pool Ind Park,  Wilson Way,  Pool,  Redruth,  TR15 3RX

Or call on:

Showroom: 01209 200887
Mobile:       07802357868