Saturday, 30 October 2010

Morso 6140 wood burning stove installation Penzance Cornwall

This installation varies slightly from the norm because the customer had no chimney in the bungalow. We came out of the Stove as normal with single wall flue pipe into a twin wall chimney system through the loft and out through the roof.


This shows the end wall of the bungalow and the markings on the floor that the customer has made to decide on the stoves location.




We have cut through the ceiling and fixed the fire plate and the first piece of twin wall flue in place making sure that it will line up with the stove.



 The slate hearth has been installed and the stove positioned. The customer wanted the stove offset to provide a storage space beside the stove.



The single wall flue pipe has been installed between the stove and the twin wall in the ceiling.



The roof before the installation of the flue starts.



The finished flue installation.



This shows the lead slate with a stainless steal cowl, the twin wall flue and top hat.



The twin wall installation that run through the loft space.



The finished installation with black sprayed flue pipe.



Stove and kiln dried wood supplied by redwood stoves.



Finaly the stove is lite and commissioned, you can also see the customers basket of wood.

For more information about us and our services please visit our showroom at

Unit 3M, Pool Ind Park,  Wilson Way,  Pool,  Redruth,  TR15 3RX

Or call on:

Showroom: 01209 200887
Mobile:       07802357868